🚚 Free Worldwide Shipping on All Orders!Shop Now
Product image 1
Product image 2
HomeStore

11201 LR101 Feedback module with 8 outlets

11201 LR101 Feedback module with 8 outlets

The most well known and commonly used form of feedback is information as to if a track on your model train layout is occupied or not. Even when you control your layout ā€œonlyā€ by hand, you will surely want to know the status of tracks that can’t be seen. Hidden staging yards are referred to as ā€œhiddenā€ for a reason.

Feedback is absolutely necessary for fully or partially automated operation. How else will a computer program ā€œseeā€ if a particular track is free or not? This information is needed in order to know if a train may enter a particular track or not.

The feedback module LR101 has 8 inputs to connect switch contacts or occupancy detectors LB101 and 1 input to connect a voltage detector LB050.

To bridge unstable switch conditions (e.g. temporary interruptions of the power supply), each signal input can be assigned a programmable delay time for feedback on the occupancy status of a track. The status is reported to the command station LZV100 via the feedback bus. The status can be displayed with a manual control LH100 or a PC (via the Digital plus interface).

$21.61

Original: $72.03

-70%
11201 LR101 Feedback module with 8 outlets—

$72.03

$21.61

Product Information

Shipping & Returns

Description

The most well known and commonly used form of feedback is information as to if a track on your model train layout is occupied or not. Even when you control your layout ā€œonlyā€ by hand, you will surely want to know the status of tracks that can’t be seen. Hidden staging yards are referred to as ā€œhiddenā€ for a reason.

Feedback is absolutely necessary for fully or partially automated operation. How else will a computer program ā€œseeā€ if a particular track is free or not? This information is needed in order to know if a train may enter a particular track or not.

The feedback module LR101 has 8 inputs to connect switch contacts or occupancy detectors LB101 and 1 input to connect a voltage detector LB050.

To bridge unstable switch conditions (e.g. temporary interruptions of the power supply), each signal input can be assigned a programmable delay time for feedback on the occupancy status of a track. The status is reported to the command station LZV100 via the feedback bus. The status can be displayed with a manual control LH100 or a PC (via the Digital plus interface).